Commercial & industrial painting

Commercial & industrial painting

Commercial and industrial painting covers offices, retail premises, apartment buildings, malls and warehouses. Beyond the paint itself, these projects depend on planning. The work has to fit around the building's operations, reach upper floors safely, use coatings suited to heavy use, and keep the finish consistent across large areas.

Who it is for

Who needs commercial & industrial painting

  • Property and facility managers

    Maintenance repaints of occupied buildings, where tenants, staff or shoppers must keep using the space.

  • Developers and contractors

    Apartment developments and new commercial buildings that need a specified system applied consistently.

  • Retail and mall operators

    Shops, supermarkets and malls, where finishes must stand up to heavy daily traffic.

  • Warehouses and industrial sites

    Large interiors and floors that need durable, practical coatings.

Problems we solve

When to call us

The situations that usually lead clients to this service.

  • Work must not stop the business

    Painting has to be phased or scheduled around opening hours so tenants and customers are not disrupted.

  • Multi-storey façades

    Upper floors need safe, properly sequenced access with scaffolding or suspended cradles.

  • Damp, cracking and peeling in busy interiors

    Defects have to be found and treated before a repaint, or they return quickly.

  • Heavy wear

    Corridors, shopfronts and floors need finishes that hold up to constant use and cleaning.

  • Tight deadlines

    Large areas, several trades and a fixed opening date need a realistic programme.

How we work

How we approach the work

The same principle as every project: understand, assess, recommend, prepare, apply and inspect.

  1. Survey and scope

    We walk the building, record the surfaces and their condition, and agree the scope with you.

  2. Specify the systems

    Coating systems for each area, based on the substrate, exposure and how the space is used.

  3. Plan around operations

    Phasing and working hours set to keep the building open, including out-of-hours work where needed.

  4. Plan access

    Scaffolding, mobile towers or cradles chosen for the height and layout of each area.

  5. Prepare and apply

    Repairs, skimming and waterproofing where needed, then undercoat and finishing coats with checks at each stage.

  6. Inspect and hand over

    The finished areas are inspected with you before handover.

Systems, materials & methods

What the work involves

  • Interior walls and ceilings

    Undercoat followed by vinyl matt for large wall areas, with gloss enamel on surfaces that need a harder-wearing finish.

  • Exterior façades

    Skim coat and undercoat, textured paint where specified, and a weather-resistant silicone exterior topcoat.

  • Damp-affected walls

    Waterproofing treatment applied to vulnerable sections before any cosmetic work.

  • Floors

    Epoxy and chlorinated rubber floor coatings for retail and warehouse floors, covered under floor coatings.

Equipment we use

  • Scaffolding erected along the façade of a multi-storey building Scaffolding Stable access for multi-storey exterior work.
  • Painters in hard hats and high-visibility vests working from suspended cradles on a building façade Cradles (suspended access) Safe access for high-level façade work.
  • Airless paint sprayer drawing paint from a bucket on site Paint sprayers Even, consistent coats on large surfaces.

Related case studies

Completed projects

Real Paint Pros Africa projects where this kind of work was part of the scope.

Pricing

What determines the cost

Larger projects are priced from a site survey and an agreed scope. The area and condition of the surfaces, the systems specified, phasing and out-of-hours working, and access equipment for upper floors all affect the quotation. We set out what is included so it can be compared like for like.

Where it is part of a contracted project, we can supply the specified materials. For the factors behind painting costs in Kenya, read our painting cost guide.

Questions

Common questions

More answers in our painting FAQ.

Can you work outside normal business hours?
Yes, where the project needs it. During the interior renovation at Rosslyn Riviera Mall, much of the painting was done overnight so the mall stayed open during business hours.
Can you paint multi-storey buildings?
Yes. We use scaffolding and suspended cradles for safe access to upper floors and façades, as on the apartment building in Kilimani.
Do you handle apartment developments?
Yes. We paint apartment buildings inside and out, including skimming, undercoat, interior finishes, textured exterior sections and exterior topcoats.
Can you supply the materials?
Where it is part of a contracted project, we can supply the specified materials.

Expert advice

Related guides

Request a quote

Request a professional assessment

Tell us about the building, the areas involved, any operating constraints and your timeline. We will arrange a survey and propose a scope and programme.